Dimensions: 1120 x 530 x 2200 mm.
GENEVA sideboard with 2 doors and 2 drawers
Each of our pieces of furniture is made individually, so the production period takes different depending on:
• from a specific piece of furniture.
• how many and what changes will be required compared to the standard model.
• quantity of ordered furniture.
• supply of specific colors and fabrics.
On average, the furniture production period is 8-12 weeks.
Please contact us for specific production time!