Height 115 Depth 53 Width 55
sit down part depth 44 Seat. part height 82
Wood Beech or Oak
DIOR Bar
Each of our pieces of furniture is made individually, so the production period takes different depending on:
• from a specific piece of furniture.
• how many and what changes will be required compared to the standard model.
• quantity of ordered furniture.
• supply of specific colors and fabrics.
On average, the furniture production period is 8-12 weeks.
Please contact us for specific production time!